title: "Vertical wood siding and board & batten installation guide | SIDEX"
description: "Cross lathing at 12 in, board & batten nailing, cuts, touch-ups: SIDEX instructions for installing wood siding vertically."
url: https://www.groupesidex.com/en/vertical-wood-siding-installation-guide/
lang: en-CA
author: "L'équipe SIDEX"
publisher: "Groupe Sidex"
publisher_type: HomeAndConstructionBusiness, Organization
publisher_url: https://www.groupesidex.com/
publisher_address: "90 Rue Pomerleau, Magog, QC, J1X 5T5, CA"
publisher_phone: "+1 819-843-6286"
publisher_email: info@groupesidex.com
---

Skip to content

# Installation guide: vertical wood siding

   Written by  [L'équipe SIDEX](https://www.groupesidex.com/en/author/tactikdev/)     Published on 23 November 2026    Last modified on 23 November 2026    Reading time 6 minutes      Summary

Double cross lathing for a horizontal nailing base at 12″ center to center, no end-cap models, and for board & batten: a 1/4″ gap between the bottom boards, 2 1/2″ minimum nails, one nail in the center of the batten. Failure to follow the installation instructions may void the guarantees.

     ![sidex siding board and batten farmhouse 04](https://www.groupesidex.com/wp-content/uploads/sidex-revetement-board-and-batten-farmhouse-04-scaled.jpg)

How to install SIDEX wood siding vertically, as set out in the SIDEX  *Installation Guide | Siding*  (version 2024-06-27). The complete guide is still available as a PDF.

**Installation Guide | Siding**  · PDF, 6 pages, version 2024-06-27

[Download the guide (PDF, 2.7 MB)](https://www.groupesidex.com/wp-content/uploads/Siding-installation-guide-SIDEX-2024-1.pdf)

Profiles installed vertically:  [board & batten](https://www.groupesidex.com/en/board-batten/) ,  [chic](https://www.groupesidex.com/en/chic/)  and  [V-joint](https://www.groupesidex.com/en/v-joint/)  (vertical and horizontal installation).  [Rabbeted bevel](https://www.groupesidex.com/en/rabbeted-bevel/)  is installed horizontally only: see the  [horizontal installation guide](https://www.groupesidex.com/en/horizontal-wood-siding-installation-guide/) .

The siding guarantees are established based on a rigorous and adequate installation according to the construction standards in effect and specific to your region. Failure to comply with the installation instructions may result in the complete cancellation of guarantees on paint and wood.

## 1. Storage

- Store the flooring in a dry, well-ventilated place. It must not rest directly on the ground.
- On a dirt or unpaved floor, place a tarpaulin on the ground before laying the package.
- Do not store for too long before installing. This will alter the characteristics of the natural wood. Consult us for advice if necessary.
- At the end of each day, cover unused dry flooring.
- Avoid storing siding in a heated area to prevent the wood from drying out.
- Avoid situations where moisture can build up under the protective cover.
- If boards are stripped and re-stacked, replace the protective plastics between them.
- Avoid storage conditions that are too different from the installation

## 2. Check the material before installing

Be sure to check the material (color, profile, etc.) BEFORE installation. If a product appears defective, DO NOT INSTALL IT. No material will be replaced or returned if it has been installed or modified in any way. Notify SIDEX Customer Service immediately.

## 3. Before beginning the installation

- Please ensure that specific building code and local requirements are met.
- Check that the weather barrier is properly installed, and that openings (doors, windows, etc.) are properly sealed. Water or constant humidity will prematurely age siding and cause damage that may be irreparable.
- Install metal flashings above and below all openings to ensure that no wood surface is left flat and exposed to standing water.
- Check that furring strips (usually 1″ x 3″ (19 x 64 mm)) are dry, securely fastened and free of defects (rot, holes, cracks or other anomalies) that could cause the wall covering to be improperly fastened.
- When installing VERTICAL siding, double perpendicular (cross) lathing is required to obtain a horizontal nailing bottom at a distance of 12″ from center to center, while allowing free circulation of air and moisture between the weather barrier and the siding. ***Check the implications of achieving a drainage cavity greater than 1″ (25mm).
- It’s essential to ensure good air circulation behind all wood coverings. At the bottom of walls and above openings, allow air to circulate freely between furring strips by installing a mosquito screen, or preferably a suitable metal starter strip, to prevent rodents and insects from entering. Don’t neglect top air evacuation, which is just as important as bottom air evacuation.

Refer to the building code and/or to the architect for a detailed drawing of the installation to be made at the top of the walls of a ventilation mechanism adapted to each situation. This should allow the expulsion of air and moisture without, however, being contiguous with the cornice or the attic.

## 4. Respect the minimum clearances

Mandatory minimum clearances from siding:

| Minimum clearance | From |
| --- | --- |
| 3/8″ (10 mm) minimum, (1″ (25 mm) recommended) | sloped flashings |
| 1″ (25 mm) | sills |
| 2″ (51 mm) | sloped roofs, balconies, patios and other flat surfaces |
| 8″ (203 mm) | floor or flat roof |

## 5. Plan the length distribution on the walls

- Distribute the boards so that the joints are evenly distributed on the wall.
- Stagger the joints so that they are evenly distributed on the wall.
- No joints should be made above or below openings.
- If quantities come from different batches, there may be color differences.
- In this case, mix the batches or make the transition at the corner of a wall or in a different section.

To limit the effects of natural lengthwise wood shrinkage and ensure a more harmonious joint distribution, we recommend not laying more than one 12′ or longer board end-to-end. We recommend inserting shorter lengths across the board. It is not necessary or even desirable to aim to reduce or eliminate the number of longitudinal joints. They help to distribute the wood’s normal shrinkage, thus improving the visual result.

## 6. Install the starting row

The starting row must be level. It’s important to check all corners of the construction to ensure that the planks on each wall are at the same height. Measure every 3 or 4 planks to check that the rows are evenly aligned, including the walls between them. If you need to adjust, do so on a few boards, avoiding exceeding 1/8″ per board.

## 7. Make the cuts

### Models without end caps at the ends of the boards

It is suggested that cuts be made at 22.5° rather than 45° (figure 1) to prevent fraying of the cut end. In addition, cuts must be made on furs.

When cutting close to a moulding, cut at 90° (Fig. 2), leaving a slight gap of approximately 1/8″ to be filled with caulking.

  [![Figure 1: 22.5° cut between two boards over a furring strip. Figure 2: 90° cut between the siding and a corner, with caulking.](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig1-fig2-fr.png)](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig1-fig2-fr.png) Figure 1: 22.5° cut between 2 siding boards, over a furring strip. Figure 2: 90° cut between siding and corner, with caulking. Labels in French in the original. Source: SIDEX Installation Guide | Siding.

Finishing wall corners by cutting boards at 45° rather than using a wood or metal corner is not recommended. It promotes degradation and shortens the durability of the wood.

### Models with end caps (TIPS)

For TIPS models, jointing is not mandatory. For vertical installation, we recommend  **not to use models with end caps** , but to install them with conventional sawn joints, touched up with stain and sloping outwards.

## 8. Touch up the cuts and nails

- Touch-ups must be carried out at a wood AND stain temperature of over 10 °C.
- Be sure to touch up all cuts made on site. Cuts must have sufficient paint to seal the ends. Stripped nails should be touched up.
- **Avoid painting all around the nail.**  Use a brush the size of the nail head, and touch up only the head and exposed wood. Retouch in the same way if any surfaces of the cladding have been accidentally damaged and any other wood exposed.

## 9. Fasten the siding (nails or staples)

Depending on the type of profile, fixing can be done with hidden nails or staples.

| Width | Models with exposed nails | Embossed models (concealed staples) |
| --- | --- | --- |
| 4″ to 6″ | 1 nail per board (figure 3) | 2 staples per fur (figure 5) |
| + de 6″ | 2 nails per board (figure 4) | 2 staples and 1 nail per fur |

   [![Figures 3 and 4: nailing of exposed-nail models on 1 x 3 furring. Figure 5: concealed staples on a tongue-and-groove model.](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig3-fig5-fr.png)](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig3-fig5-fr.png) Figures 3 and 4: models with exposed nails, on 1″ x 3″ furring. Figure 5: embossed model (concealed staples). Labels in French in the original. Source: SIDEX Installation Guide | Siding.

Fasteners must be driven in correctly: deep enough not to create a gap, but not so deep as to sink the wood. They must be flush with the surface (figure 7).

  [![Figure 7: a correct fastener flush with the surface, and two incorrect fasteners.](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig7-fr.png)](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig7-fr.png) Figure 7: left, a correct fastener, flush with the surface; right, two incorrect fasteners, driven too deep or not deep enough. Source: SIDEX Installation Guide | Siding.

### Nail specifications

- Nails should be ringed, flat-headed, stainless steel or galvanized steel. For cedar, use stainless steel fasteners only. For cedar, use stainless steel fasteners only.
- 2″ minimum length for siding and 5/8″ thick mouldings.
- 2 1/2″ minimum length for corners and 1 1/4″ thick mouldings.

### Board & batten

- For “Board & batten” (vertical installation), use minimum 2 1/2″ nails (figure 8).
- For Board & batten (vertical installation), leave a 1/4″ gap between the bottom boards. Fasten the boards with a nail 1/2″ from the edges (figure 6).
- Then place a nail in the center of the joint cover, overlapping the 2 nails below (figure 6).

  [![Figure 6: board & batten cross-section, bottom boards 1/4 in apart, nails 1/2 in from the edges, one nail in the center of the batten.](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig6-fr.png)](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig6-fr.png) Figure 6: board & batten in cross-section. Bottom boards spaced 1/4″ apart, nailed 1/2″ from the edges; one nail in the center of the batten. Source: SIDEX Installation Guide | Siding (French edition).  [![Figure 8: board & batten nailing, bottom boards and battens.](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig8-fr.png)](https://www.groupesidex.com/wp-content/uploads/sidex-guide-revetement-fig8-fr.png) Figure 8: board & batten, nailing of the bottom boards and battens. Source: SIDEX Installation Guide | Siding (French edition).

### Staple specifications

- 16-gauge, 7/16″ crown, 2″ long, galvanized steel (for pine and spruce) or stainless steel (for cedar).
- Use 2 staples per furring and set them at an angle of between 20° and 30° to penetrate both the thickest part of the siding and the furring. The required distance between 2 staples is 3/4″.
- For flat models with no visible nail, v-joint or chic style, avoid stapling precisely in the bottom of the joint so as not to expose the staple during natural wood movements.

## 10. Add adhesive where needed

A good practice that adds a safety factor is to use a construction adhesive* in certain situations, as a complementary fastening method to nails and staples.

E.g. 1- to fix short (< than 16″) lengths of stapled models, 2- for very dark siding or 3- for walls most exposed to sunlight.

It is then prescribed to apply a bead of adhesive, generally 1/4″ in diameter, between the batten and the siding, across the entire width of the siding, all according to the adhesive manufacturer’s recommendation.

*Construction adhesive suitable for exterior wood (e.g. PL400).

## 11. Caulk

To reduce the risk of infiltration, caulking must be used. It should be applied wherever water is likely to seep in, e.g. around openings (doors, windows, etc.), where mouldings and siding meet, and in any other area deemed to be at risk. Installation must follow the manufacturer’s recommendations and the building code.

## After installation: maintenance

Periodic inspection and cleaning are necessary. Simply clean with a garden hose or mild detergent to avoid damaging the stain and/or paint. Do not use a pressure washer. Touch up any damage or bare wood immediately to protect it.

To keep your siding in optimum condition, make sure it is kept clean and in constant ventilation. Any condition that keeps the siding in a state of high, frequent or permanent humidity will alter the wood’s properties and void your warranty.

Details are in the  [wood siding maintenance guide](https://www.groupesidex.com/en/wood-siding-maintenance-guide/) .

## A question about installation?

SIDEX customer service:  [819-843-6286](tel:+18198436286) .

[Contact us](https://www.groupesidex.com/en/contact/)

## Other articles you might be interested in

   [![hr sidex siding wood shingle white-cedar spruce 20401 4](https://www.groupesidex.com/wp-content/uploads/hr-sidex-revetement-bois-bardeau-cedreblanc-epinette-20401-4.jpg)   SIDEX wood siding maintenance guide Clean with a garden hose, never a pressure washer (it voids all warranty), and touch up any bare wood. On rough texture, SIDEX estimates restaining every 10 to 16 years for opaque, 6 to 12 years for two-tone and 4 to 10 years for semi-transparent, depending on sun, architecture and location.  Read more](https://www.groupesidex.com/en/wood-siding-maintenance-guide/)    [![sidex siding wood spruce clapboard 8132](https://www.groupesidex.com/wp-content/uploads/sidex-revetement-bois-epinette-declin-8132.jpg)   Installation guide: horizontal wood siding Furring strips installed vertically at 16″ center to center maximum, 8″ clearance from the ground, 22.5° cuts meeting on the furring, ringed nails (stainless steel only for cedar) and every cut touched up above 10 °C. Failure to follow the installation instructions may void the guarantees.  Read more](https://www.groupesidex.com/en/horizontal-wood-siding-installation-guide/)    [![sidex siding exterior genuine wood shingle cedar project 27742 closeup shingle](https://www.groupesidex.com/wp-content/uploads/sidex-revetement-exterieur-bois-veritable-bardeau-cedre-projet-27742-closeup-bardeau-scaled.jpeg)   SIDEX cedar shingle installation guide Two stainless steel fasteners per shingle, 3/4″ from the side edges and 1″ above the next course; 5″ or 5 1/2″ exposure on walls; at least 1/8″ between shingles and a 1 1/2″ offset between joints. Cutting corners at 45° voids the warranty.  Read more](https://www.groupesidex.com/en/cedar-shingle-installation-guide/)       [![logo sidex light](https://www.groupesidex.com/wp-content/uploads/logo-sidex-light.svg)](https://www.groupesidex.com/en/) Contact us [819 843-6286](tel:819 843-6286)  [90 Rue Pomerleau, Magog, QC J1X 5T5](https://www.google.com/maps/place/Groupe+SIDEX/@45.2780551,-72.1270174,17z/) Monday to Friday* 7am to 12pm and from 1pm to 4pm
 *Friday: except for the factory, which closes at 12pm.Let's discuss your project [Contact us](https://www.groupesidex.com/en/contact/)  Request a quote ![sidex plussier](https://www.groupesidex.com/wp-content/uploads/sidex-plussier.jpg) Patrick Lussier

Estrie, Centre-du-Québec and Montérégie

 [(819) 679-8280](tel:(819) 679-8280)  [plussier@groupesidex.com](mailto:plussier@groupesidex.com)  ![sidex acharest 1](https://www.groupesidex.com/wp-content/uploads/sidex-acharest-1.jpg) Antoine Charest

Laval, Lanaudières, Outaouais, Mauricie and Laurentides

 [(514) 833-6232](tel:(514) 833-6232)  [acharest@groupesidex.com](mailto:acharest@groupesidex.com)  ![alexis marois](https://www.groupesidex.com/wp-content/uploads/sidex-amarois.jpg) Alexis Marois

Quebec and Eastern Quebec

 [(819) 740-5386](tel:(819) 740-5386)  [amarois@groupesidex.com](mailto:amarois@groupesidex.com)  ![logo-gsc-siteweb](https://www.groupesidex.com/wp-content/uploads/logo-gsc-siteweb.webp)  ![logo-ecohabitation-siteweb](https://www.groupesidex.com/wp-content/uploads/logo-ecohabitation-siteweb.webp)  ![logo-cecobois-site-web](https://www.groupesidex.com/wp-content/uploads/logo-cecobois-site-web.webp)  ![logo-apchq-site-web](https://www.groupesidex.com/wp-content/uploads/logo-apchq-site-web.webp) © Sidex - All rights reserved 2026 |  [Web design](https://www.tactikmedia.com)  by TactikMediaNo obligation. 100% free.Request a quote

---

## Publisher

This content is published by **Groupe Sidex**, 90 Rue Pomerleau, Magog, QC, J1X 5T5, CA. Phone: +1 819-843-6286 — Email: info@groupesidex.com — https://www.groupesidex.com/